HVAC installation at the new 120,000 sq. ft. Forensics Lab at the South Carolina State Law Enforcement Division (SLED) in Columbia, SC. The project comfort air is handled by means of two 500-ton chillers, cooling towers, boilers and VAV boxes. The lab exhaust at each crime lab station is handled by a stainless steel duct system in order to protect against corrosion by lab chemicals.